The project


  • Length: 10 km
  • 19 stations
  • Overall investment cost:
    • €201.8 million
    • Rolling stock (22 carriages): €71.5 million
  • Tramway integrated with the RD5 road at Porte de Choisy (connection with Line 7 of the Paris metro) in Orly-Ville (Place du Fer-à-Cheval)
  • 6 towns connected
  • AU/ST(?) project management
  • Project management (rail, overhead cables, etc.) and maintenance/storag