The project
- Length: 11.2 km
- 18 traveler stations
- Total invesment cost: €228 million, including €118 million controlled by RATP
- Notable features of the project included complex time management, due to the number of contracting authorities for the platform (six), led by RATP, and the location (across two French departments: Val-de-Marne and Essonne).
- The rights of way covered different terrain:
- Roads: RD7 and RN7
- An airport: Orly
- Industrial zones:
- Semmaris
- Sogaris
- Silib
- Urban areas